← Back to the library
ASTS · $36.89

AST SpaceMobile

Investor relations ↗
High convictionClears the 30% growth bar
Updated Nov 12, 2026

In plain English

AST is building cell towers in space. Instead of covering the planet with ground towers, they launch huge satellites that talk directly to your normal, unmodified phone. No dish, no special handset. Mobile carriers (who already have billions of subscribers) split the revenue with them. The first test satellites work; now it's a race to launch enough of them for real commercial service.

Against the hurdle · expected return per year

12% growth bar30% growth bar
Bear case: launches slip, dilution~20%
Base case: constellation works, $114–152 in 12–18 mo~49%
Bull case: full commercial service, $238 in 12–18 mo~79%

Scale is 0–50%/yr; the bull case runs off the chart. Figures are estimates from the research note. The shape of the verdict is what matters: even the base case clears the 30% growth bar with room to spare.

Where it gets interesting

$39 – $58
$39–42: the reserve zone, and the price has fallen below it · $48–58: strongest interest above it · above $80: fairly valued

What's next

25 → 45 sats
Intermittent nationwide service switches on before year-end 2026 · ~45 satellites in orbit by mid-2027

Next earnings

Q1 2027
The launch quarter: 13 satellites with named rockets and ship dates, on SpaceX, Blue Origin, and priority-rated government launches

Catalysts to watch

01

The FCC votes on satellites for moving machines (Nov 19)

On November 19, the FCC votes on opening parts of the 28 GHz band to satellite constellations serving things that move: drones, planes, ships, cars. No company is named in the item, and 28 GHz is not one of AST's working bands today. It matters here anyway. It is the regulator writing rules for machine connectivity, the same demand the company's physical AI push is aimed at, and it follows the FCC's October 29 votes, which adopted a sweeping satellite-service rulemaking and a fresh look at auctioning more spectrum for space use. The open question from October still stands: if prime spectrum gets auctioned for direct-to-device service, does AST bid and become a spectrum owner, or stay a renter of carrier airwaves? Watch the November vote, then the bidder lists as the auctions take shape.

02

The FCC decides on SpaceX's spectrum purchase (pending)

In October, SpaceX agreed to buy Grain's 800 MHz airwaves, up to 14 MHz of prime low-band spectrum, for its planned Starlink Mobile carrier. AST was the other bidder, and its test license on the band expired October 30. The purchase is not final: it needs FCC transfer approval, and that pending decision is the live item. Approvals like this can arrive clean, arrive with conditions attached, or drag, and the conditions are the interesting outcome. Whatever the FCC does sets the low-band map for years. A SpaceX that owns low-band spectrum and runs its own carrier is a stronger competitor, and by the same logic a stronger argument for carriers to back the neutral partner that keeps no subscribers of its own. Watch for the approval order, and anything attached to it.

03

Japan signed, and pays first (Nov 9)

The joint venture is real: Rakuten AST, Inc. was agreed on November 6, owned 51% by Rakuten and 49% by AST, with up to about $1 billion of Japanese government funding behind it. On the earnings call, management filled in the part that matters most: the money is paid ahead of the spending, with most of it arriving during 2027. The venture collects revenue in three Asian markets. Everywhere else those satellites fly, the capacity joins AST's global network, and AST keeps nearly all of that revenue, paying the venture only a small single-digit share. Japan is funding satellites whose working lives mostly serve AST's other customers. If that template works, other friendly governments can copy it.

04

Government awards keep stacking (ongoing)

Three new US government awards since March through prime contractors, on top of prime seats on missile-defense and space-development programs. Watch for named disclosures and task orders, which is where awards turn into recognized revenue.

05

The Ligado docket is live (Q4 2026)

AST and Ligado met the FCC on September 30 to push their SkyTerra Next filing, which would put L-band payloads on AST's BlueBirds. Iridium, which opposes the move, met the FCC the day before. The likely outcome is a conditional approval rather than a clean win or a denial, so watch the docket. Separately, Rocket Lab is buying Iridium for about $8 billion, with shareholders approving in September and a close expected in mid-2027, which puts Iridium's L-band spectrum in the hands of a better-funded owner.

06

The US carrier venture is signed (next leg: timing open)

On October 1, 2026, AT&T, T-Mobile, and Verizon formally signed their joint venture to pool spectrum for satellite coverage, with industry veteran Paul Roth as interim CEO. Existing carrier deals stay in place, and the venture creates a legal path for T-Mobile subscribers to reach AST capacity down the road. In the same week, T-Mobile quietly removed Starlink branding from its T-Satellite website. The next leg to watch: an actual AST agreement signed through it.

Then, on their October earnings calls, all three carrier CEOs said the quiet part out loud: none of them will let SpaceX run as a mobile carrier on their ground networks. T-Mobile's CEO said there is no room for that kind of deal, on the consumer side or the machine side, while resale of satellite capacity as a vendor product stays fine. Verizon's CEO ruled it out with any satellite provider and put a standalone SpaceX ground build at $300 to $500 billion over four to six years. What died is SpaceX as a carrier renting someone else's network. What survives is SpaceX as a vendor, and AST was built to be exactly that kind of vendor: it sells capacity to carriers and keeps no subscribers of its own. Nobody named AST on those calls, so file this as structure, not a contract. The venture's first capacity purchase is still the print to wait for.

07

Europe's spectrum call (2027+)

The pending allocation of satellite spectrum to the European carrier joint venture AST is part of. Regulatory and slow, but it decides how big the European opportunity gets.

08

AST is building its own rocket (unveiled Nov 12)

On November 6, AST announced Blacklift, its own reusable rocket, built to carry up to five BlueBird satellites per flight on Firefly engines, with first flights targeted for late 2028. The price is roughly $900 million in cash plus 10 to 14 million new shares. It does not speed up a single 2027 launch: the fleet still rides other companies' rockets for the next two years. On the November 9 earnings call, the CFO gave the payment shape: the upfront cash and shares get paid within days, with some shares held back until the share-count calculation is final, and the engine and engineering payments spread over three years. At the unveiling on November 12 in New York, the company named the launch site: Wallops Island, Virginia, the pad complex the Antares rocket flew from, which the company is upgrading. The design also came out simpler than the early marketing suggested: only the first stage returns for reuse, and the two upper stages are expendable, a deliberate trade that keeps the booster low and slow enough to recover easily. The stated targets are up to two flights a month and at least 72 satellites a year once the rocket matures, with the first tank hardware due in January 2027, the first date on this program that can actually be checked. One caution stays attached: the engines carry extensive test-stand time but have never flown, and their first flight comes on a different company's rocket in late 2026. What it changes is the endgame. The company that has spent years renting rides from a competitor plans to own the ride. The same week brought two quieter firsts: the company disclosed for the first time that one of its programs carries a U.S. government priority rating, and it filed to start direct-to-cell service in Brazil with carrier TIM, on TIM's own airwaves, with commercial service allowed during the test window.

09

The record Q4 has to land (Dec 2026 quarter)

The quarter is settled: the formal filing landed November 9 and confirmed the presentation's numbers line by line, revenue of $42.3 million included, and the earnings release's conflicting figures appear nowhere in it. What runs the story now is the fourth quarter. The company held its full-year revenue guidance of $150 to 200 million, which means Q4 has to print at least $61.5 million, a record by a wide margin, with management flagging possible upside tied to government milestones and the Japan program. Behind the number sits the physical schedule: thirteen satellites with named rockets and ship dates through early 2027, a factory targeting six satellites a month from December, and intermittent nationwide service targeted to switch on before year-end in five countries.

Deep dive

01

The carriers are the moat

Most space startups face two impossible jobs: build the technology and win customers one by one. AST only has the first. AT&T, Verizon, Vodafone, Rakuten, and roughly 55 other carriers already own the customer relationships, more than 3 billion subscribers combined. They market the service, they bill for it, and they split the revenue with AST. Several are even funding the ground equipment. That is the whole trick: AST sells network extensions to companies that already have the customers, instead of competing with them.

02

The Pentagon is customer number two

Those giant antennas turn out to be useful for more than phone calls. AST holds prime positions on U.S. missile-defense and space-development programs, with documented work in positioning, tactical communications, and radar. Government awards to date top $125 million, and the same Block 2 satellites serve both missions. One constellation, two paying customers.

The bigger frame: military advantage is shifting from who owns the best platform to who sees first. AST's antennas are sensor apertures as much as communication arrays, which puts the company inside the fastest-growing budget line in defense, persistent orbital sensing. Think of it as a Cambrian explosion of sensing. When eyes evolved, every creature had to armor up or die. As proliferated satellite sensors come online, every military system built for the blind era has to adapt, and AST sells the eyes. The usual caution applies: most of the government relationship is still positioning and access, not signed production contracts. Price the demonstrated work, not the vision.

One thread now has a name and a number. AST's radar testing work rides as a subcontractor on a DARPA program run by Systems & Technology Research, an $80.55 million agreement awarded in January 2024 to repurpose commercial space systems for national security work. That program's clock ran out on November 1, 2026, and AST has asked to renew the test license behind it past November 8. No revenue for AST under the subcontract has been disclosed, so none belongs in a model yet. The tells from here are simple: a follow-on program, AST named as the prime contractor instead of a subcontractor, or a second government deal on the Japan template.

The newest piece of the defense relationship is not a contract at all. In November 2026 the company disclosed that one of its programs carries a DX rating, the highest priority rating in the U.S. defense priority system. A rating like that is not a trophy. It is a legal instrument: suppliers must accept and prioritize rated orders, and the company says it provides priority in the allocation of launch services. The next six Block 2 satellites, BlueBirds 20 through 25, are scheduled to launch in early 2027 under that rating, which makes them the first real test of whether the priority bends actual launch queues when capacity is tight. Two honest limits. A rating attaches to specific orders, not to the company as a whole, so it covers what the government has actually ordered, and nothing beyond that. And a priority claim is worth exactly what it proves in a crowded manifest. Watch the first quarter of 2027: if those six fly on schedule while others wait, the rating is real leverage. If they slip like everyone else, it is a label.

03

Japan is paying for the network

In September 2026, Japan's telecom ministry filed paperwork for a 136-satellite constellation at the ITU, filed under AST's BlueBird name. In November the model stopped being hypothetical: the Rakuten AST joint venture was formed, up to about $1 billion of government funding sits behind it, most of the money arrives during 2027 before the spending it covers, and the satellites' capacity outside Japan sells through AST's global network with AST keeping nearly all of the revenue. Japan finances its own sovereign constellation, AST supplies the satellites and the platform, and collects economics on hardware it was building anyway. If that template works, other friendly governments can copy it. Same satellites, a second revenue stack funded by taxpayers instead of shareholders.

04

The long game is airwaves and AI

Two things the market has barely priced in. First, spectrum: usable airwaves are the real bottleneck in wireless, and AST has locked up long-term rights, including 40 MHz of L-band in the U.S., plus access to its partners' bands. Second, starting with BlueBirds 47 and 48, the satellites get onboard AI compute hardware. Orbiting data centers, essentially. A third leg the street models barely mention.

On the November 9 earnings call, management gave that leg a name and a shape. The phrase was AI inference: running AI models up on the satellite itself, instead of just passing data through it. Their argument runs on physics. A huge antenna plus a lot of onboard power plus a short, constant delay to the device below is exactly what you want if the customer is not a person but a machine that has to react in real time: a car, a drone, a robot, equipment working where no tower reaches. Management calls the broader market physical AI, and listed it on the call as a business line already being developed, alongside sensing and sovereign networks. They also said, in so many words, that they are working with Google, Meta, and other AI companies on it. Google is already an investor. The honest limit, and it is a big one: there is no contract, no revenue, and no named program attached to any of this yet. It is a claimed capability and a direction, priced here as optionality, not as a business.

05

What has to happen next

From here the story runs on a launch schedule. About 25 satellites enables a beta with partner carriers late in 2026. About 45 enables full commercial service, now targeted for mid-2027 after the November earnings call moved the date out by a few months. Management's goal is roughly $1 billion in the first full commercial year. Berenberg, the first big European bank to cover the stock, rates it a buy with a $92 target, and their model needs less than 3.5% of partner subscribers to actually pay.

06

The next billion devices are machines.

The machine story has a second half, and it belongs to AST. SpaceX’s network for machines is a walled garden: it connects Tesla’s cars, Tesla’s robots, and anyone willing to buy service from a competitor. The rest of the physical AI world, rival robot makers, farm and construction fleets, delivery drones, trucks that are not Teslas, still needs connectivity in all the places cell towers never reached, and none of those companies can treat a rival’s network as neutral ground. That is the wholesale opening. It is also, probably, why the founder of Anduril, the largest machine-fleet company outside the Musk orbit, has said publicly that he owns this stock. This demand curve builds slowly, over years, on top of the phone business rather than instead of it. Watch for the first named contracts selling connectivity to fleets and equipment makers. Those, not phone subscribers, would be the second engine starting.

Put in one line, SpaceX is building connectivity as an API: identity set up at the factory, capacity bought by software, no stores and no support lines, because machine customers do not complain about dropped calls. They send telemetry and switch providers with a settings change if a rival measures better. That cuts both ways. It is why the carriers cannot just rent his network, and it is why a neutral wholesaler has a real seat: AST can sit inside several of these systems at once instead of belonging to one of them. The risk is the mirror image. If his interface becomes the default, the capacity underneath it turns into a commodity, and AST becomes one interchangeable supplier behind someone else's front door.

07

Owner's economics: why build the rocket at all

On the earnings call, management kept coming back to one phrase: owner's economics. The idea is simple. Buying launches at market prices means paying someone else's margin on every flight, at prices effectively set by your biggest competitor, in a queue you do not control. Owning the rocket turns launch into a factory cost: you pay what it costs to build and fly the thing, not what the market charges for a seat on it. Management put a rough number on the gap, saying market launch prices would have to fall by about 75% to match the cost of owning. The engine deal is built the same way: AST licensed the right to manufacture Firefly's engines itself, permanently, so it pays factory cost for engines instead of a supplier's markup, on every rocket, forever. It is the same instinct as the satellite factory in Texas, applied one level up the stack: when a cost is big enough and permanent enough, you stop renting it and start owning it. And the rocket never needs a single outside customer, because the satellite factory's own output fills it. The honest catch sits in the risk list below: an owned rocket is also an owned problem, this one has never flown, and the engine at its heart has never flown either.

⚠️ What could go wrong

01

The schedule is the thesis, and schedules slip.

Everything hangs on two dates: intermittent nationwide service switching on before the end of 2026, and roughly 45 satellites in orbit for commercial service by mid-2027. The 45-satellite date has already slipped twice, from the end of 2026 to February 2027 and now to mid-2027, and it could slide further. Every delay hands time to Starlink, which launches constantly and already operates at scale. The company also faces regulatory buildout deadlines in 2030 and 2033. A slip does not kill the story, but it pushes revenue outward and tests everyone's patience.

02

The rockets belong to others, and one of them is the competitor

Most of these satellites still fly on other companies' rockets, and the biggest provider, SpaceX, runs Starlink, the direct competitor. That dependence has been diluted, not removed. The next thirteen satellites are spread across four paths: three waiting on SpaceX at Cape Canaveral, three on Blue Origin's New Glenn in early 2027, six shipping for launches carrying a top-priority U.S. government rating that the company says gives it priority when launch slots are allocated, and the Japan program's first dedicated satellite on an Indian rocket in the first half of 2027. The company also holds launch agreements covering more than 100 satellites across 2027 and 2028, and from late 2028 its own rocket, Blacklift, is meant to end the dependence altogether. What keeps this on the risk list: the three satellites at the Cape still have no confirmed SpaceX date, the priority rating has not yet been tested in a tight queue, New Glenn has never flown the multi-orbit deployment these satellites need, and Blacklift and its engine have never flown at all. The risk is smaller and better hedged than it was a month ago. It is not gone.

03

More money will be needed.

This is one of the most capital-hungry businesses you can imagine. The company just raised $1.15 billion in convertible bonds, adding to an already large stack of debt-like financing, while burning cash heavily to build. If anything runs slower than planned, more fundraising is likely, and each round dilutes existing shareholders. Until real revenue arrives, the stock is a bet on execution.

04

Getting paid is still unproven.

Two open questions sit under the revenue story. First, the carriers: nobody knows yet what the wholesale economics look like at scale, what each user is worth, or how the network holds up when millions of phones connect at once. Second, the government: the Pentagon relationship is real, but most of it is positioning and access, not signed contracts with dollars attached, and converting it into booked revenue could be slow. The next proof points are the test service and real pricing, not press releases. The first real-world data point is soft: T-Mobile's CEO said its own satellite service is not getting as much use as anticipated.

05

The stock itself is a ride.

This name routinely moves 5 to 10 percent in a single day. Short sellers are heavily involved, which stretches every swing further. On October 1, B. Riley cut its rating to neutral with a $65 target, arguing the shares fairly reflect what is known until subscriber uptake and pricing data arrive. There is also class-action noise around past disclosures: worth knowing, not thesis-breaking. Anyone interested should size it accordingly. This is the volatile seat at the table, not the steady one.

06

The story can be misread for a long time.

On October 9, Scotiabank moved the stock 13 percent on a framing error, saying the company has "no retail customers" when the whole model is wholesale through carriers. The call was wrong, but the price move was real. That is the lesson: being right about the business does not protect you from the marginal seller not understanding it. A stock can stay cheap on narrative alone, and "the market will figure it out" is not a catalyst.

Browse the library